Commercial Gambling Management Commission of Cambodia Headquarters
All Projects

Commercial Gambling Management Commission of Cambodia Headquarters

Phnom Penh, Cambodia
Completed

Client

CGMC

Location

Phnom Penh, Cambodia

Timeline

JAN-2023 – DEC-2024

Built Area

18 floors | 6,955 m²

Project Story

From concept to delivery

Description

Construction of a modern 18-storey institutional headquarters featuring a reinforced-concrete structure, contemporary glass façade, integrated building systems, and advanced vertical transportation and safety facilities.

Objectives

The Commercial Gambling Management Commission of Cambodia Headquarters is an 18-storey modern office building with a total construction area of approximately 6,955 m². The project combines a deep reinforced-concrete foundation, efficient office spaces, modern architectural finishes, and fully integrated mechanical, electrical, communication, security, and fire-protection systems.

Design Concept

The building was designed to express professionalism, transparency, and institutional authority. Its contemporary glass façade maximizes natural light and creates a modern civic identity, while the terrace roof provides additional functional and architectural value.

The internal spaces support administrative offices, meeting rooms, public service areas, technical rooms, circulation zones, and supporting facilities. Three passenger elevators and one dedicated car elevator provide efficient movement throughout the building.

Scope of Work

Key responsibilities delivered by Kimmex.

KIM MEX carried out the major construction and building-services works, including:

  • Site preparation, earthworks, and perimeter fencing
  • Reinforced-concrete construction with a 40-metre-deep foundation
  • Structural construction of the 18-storey building
  • Installation of the modern glass curtain-wall façade
  • Construction of the terrace roof
  • Generator and backup power systems
  • Telephone and Ethernet network infrastructure
  • Audio and communication systems
  • Air-conditioning and ventilation systems
  • Fire detection and extinguishing systems
  • Building Management System (BMS)
  • Installation of three passenger elevators
  • Installation of one car elevator

Engineering Challenges & Solutions

Constructing an 18-storey building on a relatively compact site required careful coordination of foundation, structural, architectural, and building-services works. A reinforced-concrete foundation extending approximately 40 metres deep was implemented to provide the strength and stability required for the high-rise structure.

The glass façade, terrace roof, elevators, car lift, fire-protection system, air-conditioning, network infrastructure, and BMS required precise multidisciplinary coordination. KIM MEX applied structured construction planning, technical supervision, quality control, and system integration to reduce installation conflicts and deliver a safe, efficient, and modern institutional building.

Share

/