Clean Water In Mondukiri Province
All Projects Energy & Utilities

Clean Water In Mondukiri Province

Completed

Client

-

Location

Mondulkiri Province, Cambodia

Timeline

JAN-2015 – FEB 2016

Built Area

1,800m²

Project Story

From concept to delivery

Description

The Clean Water in Mondulkiri Province project was developed to improve access to safe drinking water through the construction of a modern water treatment and distribution system. Completed in 2016, the project supports residential communities with reliable clean water infrastructure.

The Background

To address the growing demand for clean water in Mondulkiri Province, the project established a complete water supply system including treatment facilities, pumping stations, and a provincial distribution network. The development enhances public health and supports sustainable regional growth.

Objectives

  • Increase access to safe drinking water.
  • Improve the provincial water supply network.
  • Support community development and public health.
  • Deliver reliable water treatment infrastructure.

Design Concept

The project was designed as an integrated water supply system, combining water collection, treatment, storage, and distribution into a reliable infrastructure network. The facility emphasizes operational efficiency, long-term sustainability, and dependable service for local communities.

Scope of Work

Key responsibilities delivered by Kimmex.

  • Construction of a dam and perimeter fencing.
  • Construction of an 1,800 m² reaction tank.
  • Construction of a raw water pumping station.
  • Installation of a provincial water supply network.
  • Installation of a 160 kVA power system.
  • Installation of water meters supplying approximately 1,000 households.
  • Construction of an administrative building, water treatment plant, and supporting facilities.

Engineering Challenges & Solutions

  • Project Duration: January 2015 – February 2016
  • Completion: February 2016 (based on project records)
  • Facility Components: Administrative Building, Water Treatment Plant, Supporting Facilities
  • Construction Area: 1,800 m²
  • Major Infrastructure: Dam, Reaction Tank, Raw Water Pumping Station, Water Distribution Network
  • Power Supply: 160 kVA
  • Service Coverage: Approximately 1,000 household water connections

Share